Transfer and Launch of Tension Leg Platform

See More Vessel Transfer and Launch

In 2001 HEGER assisted with the launch of a newly constructed Tension Leg Platform (TLP).

HEGER analyzed the transfer way loading on dry dock deck and developed a pumping plan and stability data for the load out. HEGER attended the transfer.

The Tension Leg Platform was successfully transferred and launched in 2001.

Tension Lag Platform Being Transferred Onto Dry Dock
Figure 1 – Tension Leg Platform Being Transferred Onto Dry Dock