Docking of OCEAN ONYX

See More Unusual Dockings

In 2012, HEGER was hired to assist in the docking of the semi–submersible drill rig OCEAN ONYX.

The OCEAN ONYX was successfully docked in May, 2012. The project was challenging due to the size of the rig and shape of its pontoons.

Ocean Onyx Drill Rig on land
Figure 1 – OCEAN ONYX
Docking of KAN TAN IV