Docking of KAN TAN IV

See More Unusual Dockings

In 2006, HEGER was hired to assist in developing a method of docking the drill rig KAN TAN IV.

HEGER prepared block loading calculations and prepared a pumping plan for floating dry dock.

drill rig KAN TAN IV on land
Figure 1 – KAN TAN IV
Docking of Jack Up Drill Rig Sea Fox
Docking of OCEAN ONYX