In 2004, HEGER was hired to assist in developing a method of docking the jack up drill rig ENSCO 64 on 9′-6″ high keel blocks.
HEGER developed a stable blocking plan. HEGER prepared block loading calculations and prepared a pumping plan for floating dry dock.
The ENSCO 64 was successfully dry docked in 2004 according to the plan.